Installation

Mon, Jun 14, 2010 -

Installation

Installation

Ask another person to help carry the new bathtub. Install the new bathtub perfectly level. Add wood edges fixed to the floor under the wooden base using mortar cement. Do the leveling under the wood panel located under the unit. Avoid leveling directly behind or under the flange in front of the unit. Apply a layer of mortar or plaster at the base of the bathtub legs to help with the leveling and soundproofing the bottom part of the bathtub. Once the mortar dries, cover it with polyethylene sheet.

Drill holes for plumbing by placing the faucet in position and marking the location. Drill 3/16-inch pilot holes; make sure that they correspond with the plumbing. Install the faucet and test. Fill the tub with water and inspect for leaks. Tighten any loose connections. Install the bathtub apron and apply caulk at the seams

  • Digg
  • del.icio.us
  • Mixx
  • LinkedIn
  • StumbleUpon
  • Technorati
  • Twitter

Leave a Reply